Met II is a commercial office building and hotel located in downtown Miami. The building compromises two towers built upon a single parking structure. The Wells Fargo tower is a structural steel building with a concrete core.
CSD provided construction engineering services to the steel erector for the Met II project. CSD analyzed the partially erected structure for various stages of construction. CSD also provided assistance for erection planning, locating dunnage, and connection design as needed. Due to the proximity of the building to the Atlantic Ocean, CSD also provided a hurricane contingency plan which could be used to protect the partially constructed building and surrounding area in the event of a hurricane.